Beko QWIK-PURE 15 Installation And Operation Manual page 53

Table of Contents

Advertisement

Installation and operation manual
Illustration
Assembly work
Description / explanation
23. Push the pressure relief chamber towards the
FRC until the connection of the pressure relief
chamber comes into contact with the connection
of the FRC.
24. Slide the bayonet catch over the FRC connection
and turn it clockwise as far as it will go.
25. Install the riser duct between the collector and
the measuring chamber.
0 Place the riser duct's straight fitting on the 
connection in the collector and tighten it
clockwise by hand.
0 Place the elbow union of the riser duct on
the connection in the measuring chamber
and tighten it clockwise by hand.
QWIK-PURE
®
53 | 124

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qwik-pure 30Qwik-pure 60Qwik-pure 90

Table of Contents