11. MOTOR OPERATION

Switches, vacuum circuit-breakers and earthing switches are
operated by mechanisms located behind the front panel. The
mechanisms for all the switches and breakers are operated
manually with the operating lever (standard), or are fitted with
motor operation (additional equipment).
The earthing switch and the disconnectors can only be ope-
rated manually. The earthing switches have mechanisms to
achieve fault making capabilities.
Installation instructions cover the following modules:
3PKE mechanism for load break switch (C-module)
1VDD200001
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties
without express authority is strictly forbidden. © ABB Technology Ltd.
SafeRing / SafePlus 12 / 24
Motor operation complete on 3PKE mechanism for
C-, Sl- & F6-modules
Installation Instruction
www.abb.com
Edition
Document status
Responsible
Title
1.0
RELEASED
NODIS
SafeRing/SafePlus 12/24
Location
Date
Name
Motor operation
Prepared
PPMV
2015-06-23
Espen
complete on 3PKE
Skien
Fossen
mechanism for C-, Sl- &
Checked
PPMV
2015-08-10
Asgeir
F6-modules
Skien
Elvestad
PPMV
2015-08-13
Magne
Approved
Skien
Reinholdt
Document No.

ABB Technology Ltd.
1VDD200001
3PAE mechanism for fuse-switch (F-module) 1VDD200003
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties
without express authority is strictly forbidden. © ABB Technology Ltd.
SafeRing / SafePlus 12 / 24
Motor operation complete on 3PAE mechanism for
F- & SGT-modules
Installation Instruction
www.abb.com
Edition
Document status
Responsible
Title
1.0
RELEASED
NODIS
SafeRing/SafePlus 12/24
Location
Date
Name
Motor operation
Prepared
PPMV
2015-06-23
Espen
complete on 3PAE
Skien
Fossen
mechanism for F- &
Checked
PPMV
2015-08-10
Asgeir
SGT-modules
Skien
Elvestad
PPMV
2015-08-13
Magne
Approved
Skien
Reinholdt
Document No.

ABB Technology Ltd.
1VDD200003
20
Language
EN/NO
Sheet No.
1/34
Language
EN/NO
Sheet No.
1/45
Motor operation can be retrofitted. Use the manuals.
All units are delivered with drawings showing the electrical
circuits.
3PKSE mechanism for load break switch (C-module)
1VDD200002
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties
without express authority is strictly forbidden. © ABB Technology Ltd.
SafeRing / SafePlus 12 / 24
Motor operation complete on 3PKSE mechanism
for C- & Sl-modules
Installation Instruction
www.abb.com
Edition
Document status
Responsible
Title
1.0
RELEASED
NODIS
SafeRing/SafePlus 12/24
Location
Date
Name
Motor operation
Prepared
PPMV
2015-06-23
Espen
complete on 3PKSE
Skien
Fossen
mechanism for C- & Sl-
Checked
PPMV
2015-08-10
Asgeir
modules
Skien
Elvestad
PPMV
2015-08-13
Magne
Approved
Skien
Reinholdt
Document No.

ABB Technology Ltd.
1VDD200002
2PA mechanism for circuit-breaker (V-module) 1VDD200004
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties
without express authority is strictly forbidden. © ABB Technology Ltd.
SafeRing / SafePlus 12 / 24
Motor operation complete on 2PA mechanism for
V- & Sv-modules
Installation Instruction
www.abb.com
Edition
Document status
Responsible
Title
1.0
RELEASED
NODIS
SafeRing/SafePlus 12/24
Location
Date
Name
Motor operation
Prepared
PPMV
2015-06-23
Espen
complete on 2PA
Skien
Fossen
mechanism for V- & Sv-
Checked
PPMV
2015-08-10
Asgeir
modules
Skien
Elvestad
PPMV
2015-08-13
Magne
Approved
Skien
Reinholdt
Document No.

ABB Technology Ltd.
1VDD200004
Language
EN/NO