FusionModule1000A20 预制一体化数据中心 V200R003C10快速安装指南
FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Quick Installation Guide
拆除运输防护装置
05
Removing Transport Protection Materials
空热一体机数量以实际发货为准。
The actual numbers of the intelligent heat exchanger.
strings prevail.
步骤1:拆除空热一体机防护盖板。
Step 1 Remove the protective cover from the
步骤2:安装排水支架。
intelligent heat exchanger.
Step 2 Install the drainage support.
安装供配电设备
07
Installing Power Supply and Distribution Devices
TP48400B
TP48600B
整流模块和蓄电池的组数以实际发货为准。
步骤1:安装整流模块。
Step 1 Install the rectifier.
步骤2:安装蓄电池。
Step 2 Install the battery.
步骤3:连接蓄电池正极线缆。
Step 3 Connect the positive battery cable.
步骤4:连接蓄电池负极线缆。
Step 4 Connect the negative battery cable.
(可选)安装新风一体机
06
(Optional) Installing the Fresh Air Integrated Unit
步骤1:打开机组侧面板,拧下压缩机底座上2个M8 螺母,拆除2个压缩机固定
片, 重新拧紧2个M8 螺栓,安装原盖板。
步骤2:在预制模块上取下接线盒盖板、进风口盖板、出风口盖板。
从预制模块箱体内部用十字螺丝刀拆除预制模块上预留的接线盒盖板螺钉。
a)
用美工刀割开盖板和预制模块粘连的胶水。取下接线盒盖板。
b)
从预制模块内部用十字螺丝刀拆除进风口和出风口的螺钉,并用美工刀割
开盖板粘连的胶水。取下进风口盖板和出风口盖板。
步骤3:在室外侧墙壁上预安装两颗螺栓用于悬挂本设备。
步骤4:用吊车将空调吊至安装位置,并悬挂于已经预安装好的两颗螺栓上。
步骤5:微调空调位置,保证空调机组室内侧的进、出风口与预制模块上的进、
出风口孔位对齐后,安装所有螺栓,打紧力矩。
步骤6:对空调和箱体连接位置连续均匀打胶保证可靠密封,同时对紧固螺钉头
位置进行打胶密封。
步骤7:对空调及安装面进行IPX5防水测试。
电池柜
Battery
cabinet
NOTE
The actual numbers of rectifiers and battery strings prevail.
Step 1 Open the Side panel of the smart cooling product, remove the two M8 nuts from the compressor base, remove the two
compressor fasteners, tighten the two M8 bolts and reinstall the cover plate again.
Step 2 Take off the cable connection box cover from outside of the pre-fab. module, supply air vent cover, and return air vent
cover from the pre-fab. module.
a)
Use a Phillips screwdriver to remove the screws reserved on the cover of the connection box inside the pre-fab. module.
Cut the glue between the cover and the pre-fab. module using a utility knife, and remove the connection box cover.
b)
Use a Phillips screwdriver to remove the screws reserved on the covers of the air intake and exhaust vent on the pre-fab.
module. And then cut the glue between the air intake and exhaust vent covers inside the pre-fab. module using a utility
knife. Remove the air intake and air exhaust vent covers.
Step 3 Install two bolts on the outdoor side wall to hang the device.
Step 4 Hoist the pre-fab. module to the installation position using a crane and place it on the two bolts that have been installed.
Step 5 Adjust the air conditioner position. Align the air intake and exhaust vents on the indoor side of the air conditioners with
the air intake and exhaust vent holes on the pre-fab. module, install all bolts, and tighten them to the required torque.
Step 6: Apply sealant evenly to the joint between the air conditioner and the pre-fab. module to ensure reliable sealing, and
apply sealant to the screw heads.
Step 7: Perform an IPX5 waterproof test on the air conditioner and installation surface.
TP481200B
电池架Battery rack-1
整流模块和蓄电池的组数以实际发货为准。
步骤1:安装整流模块。
Step 1 Install the rectifier.
步骤2:安装蓄电池。
Step 2 Install the battery.
步骤3:连接蓄电池间短接铜排。
Step 3 Connect short-circuit copper bars between batteries.
(1)出风口盖板
(1) Supply air vent cover
(2)接线盒盖板
(2) Cable connection box cover
(3)进风口盖板
(3) Return air vent cover
电池架Battery rack-2
NOTE
The actual numbers of rectifiers and battery strings prevail.
Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved
02
空调八个角都有定位吊耳方便吊装。
NOTE
The eight corners of the air
conditioner have positioning lugs
installed for easy hoisting.