Siemens SIPROCESS GA700 Compact Operating Instructions page 55

Continuous gas analysis
Hide thumbs Also See for SIPROCESS GA700:
Table of Contents

Advertisement

Overview
Figure 5-8
Procedure
1. Undo the six screws
2. Remove the shielding plate
3. Strip the end of signal cable to a length of approx. 1 cm.
4. Loosen the union nut from the respective cable gland
mounted device.
5. Insert the signal cable through this cable gland
6. Insert the stripped conductors of the signal cable into the terminal block in accordance with
the terminal assignment.
Devices in explosion-proof design
Compact Operating Instructions, 01/2022, A5E35134047-11
Door screws
Shielding plate
Cable glands for signal lines (7 units)
Wall-mounted device, connecting signal cables
and open the door of the wall-mounted device.
on the right side panel. To do this loosen the screws.
.
5.2 Electrical connections
on the underside of the wall-
Connecting
55

Advertisement

Table of Contents
loading

Table of Contents