Installation; Package Contents - ABB CP415 Installation And Operation Manual

Table of Contents

Advertisement

Installation

2
Installation
2.1

Package Contents

The following parts are found in the box:
– Operator terminal CP415
– 4 installation fasteners
– Power connector (connected to the 24 V DC power input)
– Installation and operation manual (1SBC159107M0201)
ABB, 1SBC159107M0201
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp415m

Table of Contents