Commissioning; Overview Of Commissioning - ABB Welcome IP Manual

Hide thumbs Also See for Welcome IP:
Table of Contents

Advertisement

6

Commissioning

6.1

Overview of commissioning

Commissioning in three sections
Commissioning of the ABB-Welcome IP system is carried out in three sections.
Please observe the order of the steps. They are dependent on each other.
Step
Local addressing
1
– For local addressing the physical addresses
are assigned for each participant in the "ABB-
Welcome IP" system.
Step
Initial commissioning of "Smart Access Point"
2
Step
Searching and certifying
3
– Searching and automatic certification of all
available participants in the "ABB-Welcome
IP" system.
– Definition of trustworthy participants for door
opening (who can open the to whom).
– Data backup
System Manual
Commissioning
see chapter 6.2 "Commissioning of a system
— Step 1: Local addressing " on page 63
see chapter 6.3 "Commissioning of a system
— Step 2: Commissioning "Smart Access
Point"" on page 83
see chapter 6.4 "Commissioning a system —
Step 3: Searching and certifying" on page 102
│62

Advertisement

Table of Contents
loading

Table of Contents