Assembly; Unpacking; Installation Requirements; Installation Position - Bosch rexroth HQ 2/G-H Assembly Instructions Manual

Table of Contents

Advertisement

22/84

Assembly

Bosch Rexroth AG, MIT: HQ 2/G-H, BS 2/G-250, 3 842 564 989/2022-06
7 Assembly

7.1 Unpacking

Lift the product out of its packaging.
Use a lift aid to lift the product. The frame of the lift transverse unit can be
used as attachment points for a round sling, for example.
Fig. 8:
HQ; BS 2/G-250, attachment points for lifting
Dispose of the packaging material in accordance with the applicable regulations
in your country.

7.2 Installation requirements

During installation, be sure to maintain the ambient conditions specified in the
Technical data (see page 75).
7.2.1

Installation position

Install the product level and plumb, at right angles, and axially parallel.
This ensures proper functioning and prevents premature wear.
F ≥2000
X
X
X
X
554 988-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth bs 2/g-250Rexroth hq 2/c-h

Table of Contents