CHAPTER 4
This chapter describes a procedure from module installation to a data link start.
4.1

Procedure Before Operation

The following steps should be performed for data link of the CC-Link/LT.
42
Downloaded from
ManualsNet.com
PROCEDURE BEFORE OPERATION
Mount QJ61CL12 on base unit.
Install a remote module into a control panel or
equipment.
Set switches of QJ61CL12
Point mode setting
Number of occupied I/O points setting
Transmission speed setting
Connect modules with dedicated flat cables,
VCTF cables, and/or flexible cables.
Set terminating resistors at both ends of the
trunk line.
Connect a dedicated power supply or power
supply adapter.
Before power-on, check that:
Modules are correctly installed
Voltage for power supply adapter is 24VDC.
The CPU module is in the STOP status.
The CPU module is in the RESET status.
No station number of remote stations is
duplicated.
search engine
Start
Power on the system.
To next page
Page 45, Section 4.3
Page 49, Section 4.5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qj61cl12

Table of Contents