4
PROCEDURES AND SETTINGS BEFORE
OPERATION
4.2
No
4
- 2
Downloaded from
ManualsNet.com
Procedures before Operation
The following flowchart shows the procedures for operating the QD63P6.
Start
Module mounting
Mount the QD63P6 to the specified slot.
Wiring
Wire external devices to the QD63P6.
Intelligent function module switch setting
Set the switches with GX Developer
(refer to Section 4.5).
Use GX Configurator-CT?
No
Make the initial setting?
Yes
Initial setting
Create a sequence program for writing
initial values with the FROM/TO
instruction.
Programming
Create and a program for counter
processing with the FROM/TO instruction
and check it.
Operation
Figure 4.1 Procedures before operation
4.2 Procedures before Operation
search engine
Yes
No
Make the initial setting?
Initial setting
Make initial settings with
GX Configurator-CT (refer to Section 6.4).
No
Make the auto refresh setting?
Auto refresh setting
Make the auto refresh setting with
GX Configurator-CT (refer to Section 6.5).
Programming
Create and a program for counter
processing without the FROM/TO
instruction and check it.
Yes
Yes