Download Print this page

Huawei FusionDC1000A Quick Manual page 36

Prefabricated modular data center
Hide thumbs Also See for FusionDC1000A:

Advertisement

Diagram
Category
NO.P001
Initial
Configurations
for the Power
NO.P002
Supply and
Distribution
System
Table 1
NO.C001
NO.C002
NO.C003
Initial
Configurations
for the Cooling
System
Table 2
List of Initial Configuration Parameters
Diagram Name
ID
Power Supply and
Distribution Device Layout
Diagram
Power Supply and
Distribution System
Diagram
Initial Configuration
Parameters for Power
Supply and Distribution
Devices
Cooling Device Layout
Diagram
Smart Cooling Product
Teamwork Relationship
Diagram
Indoor and Outdoor Unit
Signal Cable Wiring
Diagram
Initial Configuration
Parameters for Cooling
Devices
Detailed Initial Configuration
Parameters
N/A
N/A
Initial Configuration Parameters for
an Integrated UPS
MCCB Current Parameters
N/A
N/A
N/A
Initial Configuration Parameters of
Remote Temperature and Humidity
Sensor DIP Switches for 25 kW Air
Cooled Smart Cooling Products
Initial Teamwork Configuration
Parameters for 25 kW Air Cooled
Smart Cooling Products
Initial Temperature and Humidity
Configuration Parameters for 25 kW
Air Cooled Smart Cooling Products
Air conditioner pipe electric heater
DLXELL XR02CX thermostat initial
configuration parameters
Fire door electric heater DLXELL
XR02CX thermostat initial
configuration parameters
Ventilation window electric heater
DLXELL XR02CX thermostat initial
configuration parameters
Extinguishant Control Panel electric
heater DLXELL XR02CX thermostat
initial configuration parameters

Advertisement

loading