NO.F004 Fire Extinguishing Device Installation Position Diagram (CE)
Electric heating for air inlet
window
Note: The batteries of the extinguishant control panel and VESDA
batteries are installed and delivered according to the picture. Check
that batteries are intact and free of leakage onsite, remove foam,
and connect cables.
EXIT
EXIT-1
Opening direction
Slide 200mm
Slide 200mm
Opening direction
Air Conditioner-B1
Air Conditioner-C1
Air Conditioner-A1
(With Electric Heating &
(With Electric Heating &
(25KW)
Humidifier 25KW)
Humidifier 25KW)
Signal window
E
Opening direction
Slide 200mm
UPS-2
UPS-1
Warning Signs-1
Abort
P
Fan-2
Air Conditioner-D1
D
(25KW)
Fan-1
Horn Strobes-2
VESDA Power
Power window
Power PDB-1
Install the external horn strobe onsite.
Connect cables to the electrical actuator, bind the cables to the cable tray, and assemble the cables onsite.
Connect VESDA battery cables onsite.
Connect cables for extinguishant control panel batteries onsite.
Install the external horn strobe onsite.
Connect VESDA battery cables onsite.
Connect cables for extinguishant control panel batteries onsite.