Canon BESTEM-D01R Manual page 11

Die bonder
Hide thumbs Also See for BESTEM-D01R:
Table of Contents

Advertisement

Preface
■Unpacking and Installation Inspection
The system body, display, cables and etc. are packed in polyethylene sheets by using air caps.
Remove the polyethylene sheets before assembly.
!Caution
To move the machine between the places at greatly different temperatures,
e.g., between the outdoors and the room in winter, take sufficient time.
Otherwise the machine may be dewed. In such a case, unpack the
machine after the machine is warmed up to the room temperature.
!Important
Be careful where moving and packing the work transfer unit.
The transfer arm can easily be damaged and rehabilitation may be required.
!Important
The removable doors and panels should be taken off from the system and
stored at a safe place until completion of the installation.
●Panels and steel constructions
Check if they are not loose or if they show any signs of crack or damage.
Check the coating for peeling.
●Buttons and screws
Check if they are not loose or if they show any signs of crack or damage.
●System in total
Check if all panels and components are fixed and not damaged.
!Important
The removable panels should be taken off from the system and stored at a safe
place until the installation has been completed.
Unpacking
Receiving Inspection
Visual Check
C A U T IO N
IMPORTANT
IMPORTANT
IMPORTANT
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents