4. Install top supports and covers of the battery terminal protective covers.
4

Verifying the Installation

Item
Check
Expected Result
Method
PowerPOD
Observe
The installation complies with the design requirements.
installation
Equipment
Observe
The equipment is intact and free from inclination, distortion,
appearance
pain drop, and rust.
All connections are secure.
External
Observe
The ground cable is securely connected, and the ground
grounding
resistance is less than or equal to 10 ohms.
Cable connections
Observe
All cable connections are secure, especially network cable
connections.
Bare wires near the wiring terminals and terminal handles are
wrapped in insulation tape or heat-shrink tubing.
Flat washers and spring washers of all wiring terminals are
securely installed and in good contact.
Cables are routed in the way convenient for future
maintenance and expansion.
Cabinets are clean and have no dust, excessive cable ties,
cable cuts, or other foreign matter inside.
Cable binding
Observe
Cables are neat and not coiled, and excessive parts are cut.
Cable ties do not overlap, and the joints are evenly cut
without burrs.
Cables are placed properly and not tense at turning points.
Cable routes are straight and smooth, and do not intersect
inside a cabinet.
Labels
Observe
All labels are correct, clear, and complete.
Copper bars on
Observe
Copper bars on the cabinet tops are not deformed.
the cabinet tops
Screws at the copper bar joints are tightened.
The cabinet tops are clean and free of foreign objects.
FusionPower6000 V100R021C10 Quick Guide

Power-On Commissioning

2.4 MW Power distribution system architecture
Power-On Commissioning for the Power Supply and
1
Distribution System
Commissioning the Low-Voltage PDF
1.1
1. Check that the voltage, current, and frequency of the upstream circuit breaker for the low-
voltage PDF meet requirements.
2. Switch on the upstream input circuit breaker and check the indicator on the low-voltage PDF.
If they light on, the PDF is powered on properly.
3. Switch the input circuit breaker to the Test position. Switch the interlocked standby circuit
breaker to the Test position.
4. Switch on and off the two circuit breakers respectively to perform an impact test.
5. Switch the input circuit breaker to the working position, perform the impact test again and
switch on the circuit breakers.
6. Check that the downstream equipment is properly connected. Then measure or check whether
the output voltage and current meet requirements. If yes, switch on the output circuit breaker
to power on the equipment.
1.2
Powering On and Starting the UPS
1. Turn on the SPD switches 1QFS and 2QFS.
2. Turn on the upstream bypass and mains input switches.
Obtaining Startup Password
1. Download and install the Service Expert app, On the app home screen, tap StartUp to access
the Set Startup screen.
2. Set the language, time, network parameters, system parameters, and battery parameters on
the Settings Wizard screen.
Starting the Inverter on the LCD
1. Choose Common Functions > Inv. ON.
2. On the displayed login screen, select a user name and enter the password.
3. In the displayed dialog box, tap Yes to start the inverter.
Starting the Inverter on the WebUI
1. In the address box of the browser, enter https://UPS IP address.
2. Enter the correct user name and password and click Login.
3. On the WebUI, choose Monitoring > UPS System > Running Control, and click Inv. ON, and
confirm the operation to start the inverter.
03
2
Power-On Commissioning for the Management System
Preparations and WebUI Login
2.1
1. Connect a network cable between the PC network port and the WAN_1 port on the
ECC800-Pro.
2. Configure the PC IP address and the WAN_1 IP address in the same network segment.
3. Set LAN parameters.
4. Set Internet Explorer parameters.
5. Log in to the ECC800-Pro WebUI.
Preparations and App Login
2.2
1. Download and install the FusionModule app from Huawei AppGallery.
Huawei AppGallery installed on the PAD: Log in to the Huawei AppGallery client, search
for FusionModule, and tap Install.
Huawei AppGallery not installed on the PAD:
Method 1: Log in to Huawei AppGallery (https://appgallery.huawei.com/), search for
FusionModule, and tap Install.
Method 2:Log in to the ECC800-Pro WebUI on a PC and scan the QR code to install the
app.
2. Hold down the SW button on the ECC800-Pro for less than 3s to enable the WiFi function.
3. (Optional) Enable the WiFi function on the ECC800-Pro WebUI.
4. Log in to the app.
2.3
Commissioning the Configuration Wizard
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Maintenance > Configuration Wizard to access the parameter configuring
page for the deployment wizard.
3. Configure related parameters on the page as instructed. For details, see the function
description on the left of the page.
4. After configuring the parameters, click Finish.
5. After confirming that the commissioning Result is normal, enter the Checker Name and
Check Date, and click Configuration Completed.
2.4
Setting the Date and Time
1. Choose System Settings > System Parameters > Time.
2. Set the time zone, date, and time based on the site requirements or click Obtain Local
Time, and click Submit.
Adding a Device
2.5
1. Choose System Settings > Device Management > Add Device.
2. After a device is added, the details about the device connected to the PowerPOD are
displayed.
Devices to be manually added: reactive power compensation cabinet (SVG) and
transformer.
Devices that can be automatically discovered: UPS, feeder cabinet, and low-voltage
cabinet.
Adding a Transformer
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a transformer.