Download Print this page

Huawei NetCol8000-A045D Quick Manual page 35

Hide thumbs Also See for NetCol8000-A045D:

Advertisement

8.10
(Optional) Installing the Cap (Applicable to Upflow Units)
It takes two persons to install the cap using a 2 m step ladder.
Before installing the cap, attach the thermal insulation foam in the accessories to the top
beam of the smart cooling product, and ensure that the reserved holes in the thermal
insulation foam are aligned with the holes in the beam. Check that the cap is intact and free
from scratches, that the sheet metal is not bent, and that the screws are secure.
Before installing the cap, reserve space on the top of the indoor unit. The height of the
reserved space must be greater than that of the cap.
Cap dimensions
Indoor Unit Model
NetCol8000-A045U
NetCol8000-A060U
1. Remove the cap front panel using a
Phillips screwdriver. Place the cap on the
top of the cabinet.
3. Secure the cap front panel to the
frame, and adjust the angle of the
front panel blade.
Indoor Unit Dimensions
(H x W x D) (mm)
2000 x 900 x 900
2000 x 1100 x 1000
Cap Dimensions (H x W x D) (mm)
600 x 900 x 900
600 x 1100 x 1000
2. Secure the cap using M5 tapping screws.
900 mm wide indoor unit: 2 PCS
respectively on the front and the
rear, and 3 PCS respectively on the
left and right
1100 mm wide indoor unit: 4 PCS
respectively on the front and the
rear, and 3 PCS respectively on the
left and right
34

Advertisement

loading