ABB HT596419 Operation Manual page 92

Table of Contents

Advertisement

Operation Manual / TPL65VA32 / VA33
8 Disassembly and assembly / 8.9 Installing cartridge group
© Copyright 2020 . All rights reserved.
Attach lifting gear to lifting device (90190) and turn compressor cas-
u
ing (72000).
By hand, screw three press-off nuts (61090) onto bearing casing
u
studs, equally spaced around circumference and up to end of thread.
Push compressor casing (72000) onto cartridge group to fit snugly
u
and fasten it using nuts (61037).
Secure three press-off nuts (61090) against compressor casing
u
(72000) by tightening them to specified torque. (See chapter Table of
tightening torques.)
Remove lifting device (90190).
u
Fit sealing air line (56501) between compressor casing (72000) and
u
variable turbine geometry module (56100).
HZTL2464_EN
Rev.E
March 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65va32

Table of Contents