Emergency Operation Tpl - ABB HT596419 Operation Manual

Table of Contents

Advertisement

Operation Manual / TPL65VA32 / VA33
4 Operation / 4.5 Emergency operation TPL..VA
4.4.3 Replacing the speed sensor
4.4.4 Failure of speed measuring system
4.5 Emergency operation TPL..VA
© Copyright 2020 . All rights reserved.
WARNING
Hot cable connector and hot speed sensor
Risk of burning. During operation, the cable connector and the speed
sensor can reach temperatures exceeding 100 °C.
Wear safety gloves when removing the cable connector and speed
u
sensor.
Wear safety gloves to protect against thermal hazards.
Reduce engine performance to the idling speed, then stop the engine.
u
Switch off the lubricating oil supply to the turbocharger.
u
Disconnect the cable connector from the speed sensor.
u
Screw out defective speed sensor.
u
Screw in a new speed sensor up to the limit block.
u
Observe the tightening torque (see the table of tightening torques in
u
the chapter entitled Disassembly and assembly).
NOTICE
Sealing of the speed sensor
The speed sensor is designed with a sealing lip and does not require
any additional gasket for assembly.
Connect cable connector to speed sensor.
u
Switch on lubricating oil supply to turbocharger.
u
Possible reasons for failure of the speed measuring system are de-
scribed in the chapter Troubleshooting.
HZTL2464_EN
Rev.E
March 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65va32

Table of Contents