Installation and commissioning flowchart
Identify the frame size of your drive: R1 or R3.
Plan the installation: select the cables, etc.
Check the ambient conditions, ratings and required
cooling air flow.
Unpack and check the drive.
If the drive will be connected to an IT (ungrounded) or
corner grounded system, check that the internal EMC
filter is not connected.
Install the drive on a wall or in a cabinet.
Remove the dust protection sticker.
Install the cable glands and route the cables.
Check the insulation of the input cable, the motor and
the motor cable.
Connect the power cables.
Connect the control cables.
Check the installation and the gaskets.
Commission the drive.
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com
Task
See
Technical
data:
Ratings
on page
Planning electrical installation in the ACS355
user's manual and
Power cable sizes and fuses
on page 52.
Technical data
on page
50
Mechanical
installation:
Unpacking the drive
page
34
Hardware
description:
Type code
Electrical
installation:
Connecting the power
cables
on page
40
Mechanical installation
on page
Planning electrical installation: Routing the
cables in the ACS355 user's manual
Electrical installation: Checking the insulation of
the assembly in the ACS355 user's manual.
Electrical
installation:
Connecting the power
cables
on page
40
Electrical installation: Connecting the control
cables in the ACS355 user's manual.
Installation checklist
on page
Start-up, control with I/O and ID Run in the
ACS355 user's manual.
27
50
on
on page
31
33
43
About the manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs355-03e-08a8-4+b063

Table of Contents