Installation Work - Mitsubishi Electric AHU-KIT-SP Manual

Air handling unit interface
Table of Contents

Advertisement

14. Installation work

●Installation procedure
Install AHU interface in the direction shown in the figure below so that letters can be read correctly.
1. Slide the fixed part down (2 places).
2. Hang the box on the DIN rail.
3. Push the fixed part (2 places) up and fix onto the DIN rail.
●Installation clearances
Make sure it is securely fastened.
MODEL NAME
Air Handling Unit Interface
MODEL TYPE
AHU-KIT-SP
ISSUE
CLASSIFICATION
INSTALLATION
MORIKAWA
DWG NO.
REV.MARK PAGE
PSZ000Z308
21.09.17
35/38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents