4.7 Installing DC Output Power Cables

Prerequisites
Procedure
Step 1 Remove the front panel of the DC PDU.
Step 2 Route DC output power cables through the protective board on the top of the subrack.
Step 3 Secure the negative DC output power cable to the corresponding DC output circuit breaker
based on the actual load.
Step 4 Connect the positive DC output power cable to the corresponding screw on the RTN+ busbar.
Issue 05 (2020-04-07)
Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No
operations allowed."
Switch off all circuit breakers before installing power cables.