Subsequent Operations - Huawei ETP48400-C9A2 User Manual

Embedded power
Table of Contents

Advertisement

ETP48400-C9A2 Embedded Power
User Manual

6.9 Subsequent Operations

Procedure
Step 1 Reinstall the removed cover or panel if any.
Step 2 Check whether the paint on the subrack exterior is intact. If any paint has flaked, repaint the
area to avoid corrosion.
Step 3 Ensure that the site is clean before you leave the site.
----End
Issue 05 (2020-04-07)
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents