6.6 Procedure

Use this procedure to install an A-240Z-A CPE.
1
2
Figure 13
A-240Z-A CPE connections
ON/OFF
ON/OFF
button
TEL1 and TEL2
POTS ports
(RJ-11)
3
4
5
6
Issue: 01
 
All manuals and user guides at all-guides.com
Place the CPE unit on a flat surface, such as a desk or shelf.
Note —
The A-240Z-A cannot be stacked with another CPE or with
other equipment. The CPE mounting requirements are:
allow a minimum 100 mm clearance above the top cover
allow a minimum 50 mm clearance from the side vents
do not place any heat source directly above the top cover or below the
bottom cover
Review the connection locations as shown in Figures 13.
TEL1
TEL2
WAN
LAN1
LAN2
LAN3
WAN port
LAN ports (4)
(RJ-45)
(RJ-45)
Connect the Ethernet cables to the RJ-45 ports; see Figure
ports.
Connect the WAN cable to the RJ-45 WAN port; see Figure
WAN port.
Route the POTS cables directly to the RJ-11 ports as per local practices.
The POTS port to the left is labeled TEL1 for Line 1 while the port on the right is labeled TEL2
for Line 2, as shown in Figure 13.
Connect the power cable to the power connector.
3FE-46615-AAAA-TCZZA
LAN4
USB
USB
UPS
LED
USB 2.0
Power supply
ports (2)
connector
13
13
Install an A-240Z-A CPE
POWER
Power
connector
Reset
button
LED on/off
button
26018
for the location of the RJ-45
for the location of the RJ-45
51

Advertisement

Table of Contents
loading

Table of Contents