Procedure - Nokia 7368 ISAM ONT BGW320-505 Product Manual

Intelligent services access manager
Hide thumbs Also See for 7368 ISAM ONT BGW320-505:
Table of Contents

Advertisement

7368 ISAM ONT BGW320-505 Product Guide

4.5 Procedure

Use this procedure to install an BGW320-505 indoor ONT.
1
2
Issue: 01
Release 06.02.00b | October 2019 | Edition 01
Place the indoor ONT unit on a flat surface, such as a desk or shelf.
Note — The BGW320-505 ONT cannot be stacked with another ONT
or with other equipment. The ONT mounting requirements are:
place the unit in a vertical upright position with the feet and grill facing
down and the flat top facing up
allow a minimum 100 mm clearance above the top cover
do not place any heat source directly above the top cover or below the
bottom cover
Warning — There is a risk of overheating if the BGW320 is not properly
ventilated. The unit should not be placed in an enclosed cabinet or
location without proper ventilation.
Make sure the temperature requirement described in Section
adhered to.
Review the connection locations, as shown in Figure 5.
3FE-47753-AAAA-TCZZA
Install an BGW320-505 indoor ONT
3.6
are
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents