Electrical Installation - Mitsubishi Electric LGH-50RVS-E Installation Instructions Manual

Lossnay heat recovery ventilator
Hide thumbs Also See for LGH-50RVS-E:
Table of Contents

Advertisement

4.4 Electrical installation

With this product, the wiring installation method will vary according to the design of the system.
Perform electrical installation to meet appropriate standards and regulations.
* Always use double insulated PVC cable for the transmission cables.
* Wiring work must be performed by qualified professionals.
* All supply circuits is disconnected and all LED on the circuit board shall be lit off, before accessing to the terminal devices.
Names of components in control box
Wire connection diagram
* TM1, TM2, TM3, TM4 and TB5 are field work.
* Be sure to connect the ground wire.
* Be sure to install an all pole electric leakage isolator.
* Always use an isolator for the main switch power connection.
* Select proper circuit breaker according to the electrical current information in the chart below.
Model
Maximum current when operating [A]
Inrush current after power supply ON [A]
Power supply
TM1
Grounding terminal
SW6
SW5
SW2
SW11
SW12
LGH-50RVS-E
10 ms
100 ms
N
TM2
L
Isolator
(Field supply)
TM3
9 10
Operation signals
TM1: Terminal block (Power supply)
TM2: Terminal block (External control input)
TM3: Terminal block (Monitor output)
TM4: Terminal block (Transmission cable)
TB5: Terminal block (M-NET Transmission cable)
TM2
TB5
TM4
TM3
LGH-80RVS-E
2.2
3.7
6.1
3.6
TM2
Z
Volt-free contact
Y
PCB
2
TM1
12 V or 24 VDC
1
TB5
S
Shield wire
B
TM4
M-NET
A
1 2
Lossnay controller (Max. 2) or
2nd Lossnay (Max. 15)
Eng-10
LGH-100RVS-E
4.2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lgh-80rvs-eLgh-100rvs-e

Table of Contents