Installation And Removal Of The Unit - Mitsubishi Electric CR800 Series Instruction Manual

Industrial robot, controller setup, basic operation, and maintenance
Hide thumbs Also See for CR800 Series:
Table of Contents

Advertisement

2Unpacking to installation

(3) Installation and removal of the unit

The installing-and-removing procedure to base units, such as the power supply unit, the sequencer CPU unit, the
robot CPU unit, the input-and-output unit, and the intelligent functional unit, is shown in the following.
■ Installation
1) When a cap is attached to the unit connector of the base unit, remove it.
2) Place the concave part (a) of an unit onto the guide (b) of the base unit.
3) Push in the unit until the module fixing hook (c) snaps into place.
Check that the unit fixing hook (c) hangs the base unit and the unit is mounted on the base unit securely.
4) Fix the unit on the base unit with the screws.
[Note]
・ Make sure to tighten all the unit fixing screws to prevent the unit from falling.
・ The user needs to prepare the unit fixing screws (M3x12).
2-14 Installation and connection

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr800-dCr800-rCr800-q

Table of Contents