Installation Process - Huawei OptiXRTN 980L Quick Installation Manual

Radio transmission systemv100
Table of Contents

Advertisement

Installation Process

Assembling the
Antenna-side
Connector
Page 34
Hoisting the
Elliptical Waveguide
Page 35
Laying Out and
Installing the
Elliptical Waveguide
Pages 36 to 43
Assembling the
indoor connector
Page 34
Grounding the
Elliptical Waveguide
Pages 44 to 46
Waterproofing
Connectors
Page 47
Installing Ethernet
Installing E1 Cables
NOTE
•This document uses the elliptic waveguide and dehydrator manufactured by Andrew as
examples to describe the installation. In practice, see the delivered installation guides to install
the elliptic waveguides and dehydrators actually used.
•For newly delivered equipment, BUs, RFUs, and RF cables have been installed. Installation
operations in appendixes provide reference for capacity expansion or parts replacement.
Installing an
Antenna
See the Antenna
Installation Guide.
Installing an
Elliptical
Waveguide
Pages 34 to 47
Installing a
Dehydrator
Pages 48 to 49
Installing IF/RF
Cables
Page 56
Service Cables
Pages 57 to 58
Installing XPIC
Cables
Page 59
Installing Fibers
Pages 60
Page 61 to 63
Start
Installing a
Cabinet
see N63E Cabinet
Installation Guide
Installing Cabinet
Cables
Pages 19 to 22
Installing IDU
Cables
Pages 23 to 33
Checking the
Installation
Page 55
Checking the
Installation
Page 56 to 63
End
Installing Power
Cables
Pages 19 to 20
Installing Ground
Cables
Page 21
Laying out Cabinet
Cables
Page 22
Installing IF Cables
Pages 23 to 25
Installing Ethernet
Service Cables
Page 26
Installing XPIC
Cables
Page 26
Installing Fibers
Pages 27 to 28
Installing E1 Cables
Page 28
Installing STM-1e
Cables
Page 29
Installing NM
Cables
Page 29
Installing External
Clock Cables
Page 30
Installing Asynchronous
and Synchronous Data
Cables
Page 31
Installing External
Alarm Cables
Page 32
Installing Orderwire
Phone Cables
Page 33