Front Cover Installation And Shower Commissioning - Aqualisa QUARTZ Electric Installation Manual

Hide thumbs Also See for QUARTZ Electric:
Table of Contents

Advertisement

section using a round file. Ensure the cover
fits over cables and pipe correctly.
2
Fix the self tapping screws a couple of turns
into the fixing points at the top and bottom
of the unit to aid locating the fixing points
when securing the front casing to the back
plate.

Front cover installation and shower commissioning

1
Without fitting the shower head, fit the hose
washer into the hose and attach to the
shower outlet to allow the water to discharge
!
This shower must be fully commissioned following the procedure detailed
safely to waste.
below before use. Failure to do so could damage the shower and invalidate
the guarantee.
1
1
Without fitting the shower head, fit the hose
Without fitting the shower head, fit the hose
2
Ensuring the electric supply remains isolated
washer into the hose and attach to the
washer into the hose and attach to the
turn on the water supplies. Push the solenoid
shower outlet to allow the water to discharge
shower outlet to allow the water to discharge
piston up until water runs through and out of
safely to waste.
safely to waste.
the hose for a few seconds before releasing
the piston.
2
2
Ensuring the electric supply remains isolated
Ensuring the electric supply remains isolated
3
Attach the hose to the shower handset as detailed above after passing it
turn on the water supplies. Push the solenoid
turn on the water supplies. Push the solenoid
through the hose restraint/gel hanger (if required) and place in the handset
piston up until water runs through and out of
piston up until water runs through and out of
holder in a position where it can spray safely. Push the solenoid piston up until
the hose for a few seconds before releasing
the hose for a few seconds before releasing
water sprays through the handset for a few seconds before releasing the
the piston.
the piston.
piston.
4
3
3
Turn the flow control valve on the shower
Attach the hose to the shower handset as detailed above after passing it
Attach the hose to the shower handset as detailed above after passing it
unit to the full cold (6 o'clock position). Turn
through the hose restraint/gel hanger (if required) and place in the handset
through the hose restraint/gel hanger (if required) and place in the handset
Quartz
Electric Installation Guide 23
TM
7
8
10
9
11
10
10
12
11
11
Us
To
12
12
1 T
2 P
i
3 R
c
f
Us
U
s

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QUARTZ Electric and is the answer not in the manual?

Questions and answers

Table of Contents