Aqualisa Quartz Digital Installation Manual
Hide thumbs Also See for Quartz Digital:

Advertisement

Quartz
TM
Digital
Exposed with adjustable height head
Installation guide
Quartz Digital exposed with adjustable head installation instructions
Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Quartz Digital and is the answer not in the manual?

Questions and answers

Summary of Contents for Aqualisa Quartz Digital

  • Page 1 Quartz Digital Exposed with adjustable height head Installation guide Quartz Digital exposed with adjustable head installation instructions Page 1...
  • Page 2 Quartz Digital exposed Quartz Digital exposed with adjustable head Quartz Digital exposed with adjustable head installation instructions Page 2...
  • Page 3 Components Components (HP/Combi) (Gravity pumped) Literature not shown Literature not shown Quartz Digital exposed with adjustable head installation instructions Page 3...
  • Page 4: Safety Information

    The control must not be installed in situations where the ambient temperature is likely to fall below 5°C or rise above 40°C. We do not recommend the use of Quartz Digital in steam therapy facilities. This appliance must be earthed.
  • Page 5 Installation of Digital Gravity Pumped processor (for gravity stored systems) The Quartz Digital Gravity Pumped shower system is designed to operate up to a maximum static pressure of 100kPa ((1 bar)(10 metres head)(14.5psi)). Under no circumstances must the pumped processor be connected directly to the water main or in line with another booster pump.
  • Page 6: Pipe Sizing

    Regulations prior to connection of the product. After installation Familiarise the end user with the Quartz Digital operation and hand them this guide. Complete and post the guarantee card or register online at www.aqualisa.co.uk Quartz Digital exposed with adjustable head installation instructions...
  • Page 7: Installation Instructions

    (shown overleaf) before commencing installation. The Quartz Digital shower system is supplied with universal fixings intended to secure it to a suitable wall. To ensure safe operation and installation of this product, the processor MUST be installed in one of the orientations shown.
  • Page 8 Flush out the hot and cold supply pipes. The maximum hot water inlet temperature must be no more than 65°C. Quartz Digital exposed with adjustable head installation instructions Page 8...
  • Page 9 Temporarily slide the gel hook up the rail ensuring it is positioned higher than the lower fixing bracket assembly. Place the lower bracket support pillar into position ensuring the locking lug is correctly fitted into the location hole. Quartz Digital exposed with adjustable head installation instructions Page 9...
  • Page 10 Slide the fixing bracket over the rail onto the support pillar and repeat the above fixing procedure. Quartz Digital exposed with adjustable head installation instructions Page 10...
  • Page 11 If the ceiling height is over 2.4m (8ft), a Digital riser rail extension kit will be required. Contact our Customer Service Department to purchase a riser rail extension kit (part no: 223217). Quartz Digital exposed with adjustable head installation instructions Page 11...
  • Page 12: This Appliance Must Be Earthed

    We recommend protecting surface mounted cables in suitable, approved conduit to avoid the risk of damage from vermin. The data cable and power lead should also be clipped in place with ‘P’ clips or similar, to avoid accidents. Quartz Digital exposed with adjustable head installation instructions Page 12...
  • Page 13 15 seconds to clear any debris. Turn the shower off and isolate from the electricity supply. Quartz Digital exposed with adjustable head installation instructions Page 13...
  • Page 14 Gravity Pumped Digital processors fitted to gravity systems may be set to ‘NORMAL GRAVITY’, or for water economy, ‘ECO’ flow rate modes. WHEN MAKING ANY ADJUSTMENT TO THE PROCESSOR SETTINGS THE POWER MUST BE ISOLATED. Quartz Digital exposed with adjustable head installation instructions Page 14...
  • Page 15 Site conditions can affect temperature settings, installer to adjust as required. ALL COPPER PIPE WORK MUST BE CROSS-BONDED AND CONNECTED TO A RELIABLE EARTHING POINT. Quartz Digital exposed with adjustable head installation instructions Page 15...
  • Page 16 Part No:700994 Issue 01 Jan 14 Please note that calls may be recorded for training and quality purposes The company reserves the right to alter, change or modify the product specifications without prior warning ® Registered Trademark Aqualisa Products Limited...
  • Page 17 Digital Showers Mixer Showers Power Showers Smart Showers Shower Towers From Top Shower Brands Mira Showers Aqualisa Showers Triton Showers Gainsborough Showers Shower Pumps can upgrade your showering experience even more Stuart Turner Shower Pumps Salamander Shower Pumps Grundfos Shower Pumps...

This manual is also suitable for:

Isys

Table of Contents

Save PDF