Advertisement

Quick Links

   
T
T
h
h
i
i
s
s
g
g
Contents of 
Contents of 
 
 
delivery and
delivery and
needed tools
needed tools
F
F
Quick Guide
Quick Guide
u
u
i
i
d
d
e
e
i
i
s
s
a
a
q
q
u
u
i
i
c
c
k
k
r
r
e
e
f
f
e
e
r
r
e
e
i
i
n
n
s
s
t
t
a
a
l
l
F
F
l
l
e
e
x
x
i
i
Lite
Lite
B
B
T
T
S
S
Clearances
Clearances
l
l
e
e
x
x
i
i
Lite
Lite
B
B
T
T
n
n
c
c
e
e
f
f
o
o
r
r
F
F
l
l
e
e
x
x
i
i
L
L
i
i
t
t
e
e
B
B
T
T
l
l
a
a
t
t
i
i
o
o
n
n
, cabling, and maintenance
, cabling, and maintenance
can
ca
n
be
be
moun
mo
unte ted
d
on
on
Preparing installation
Preparing installation
3
3
Mounting bracket
Mounting bracket
assembly
assembly
S
S
S
S
1
1
9
9
0
0
0
0
(
(
F
F
Q
Q
F
F
A
A
)
)
a
a
n
n
d
d
.
.
a
a
wall
wa
ll
or
or
on
on
a
a
pole le.
po
.
 
 
Optional stacked
Optional stacked
installation
installation
6
6
 Antenna
 Antenna
7
7
8
8
9
9
 
 
 
 
 
 
2
2
1
1
0
0
0
0
(
(
F
F
Q
Q
G
G
A
A
)
)
Wall
Wall
installation
installation
Pole installation
Pole installation
Cabling
Cabling
Grounding
Grounding
Cabling rule for 
Cabling rule for 
interfaces
interfaces
SFP cabling
SFP cabling
cabling
cabling
Power cabling
Power cabling
Front cover 
Front cover 
installation
installation
Optional items
Optional items
installation
installation
Maintenance
Maintenance
Deploying
Deploying
in small space
in small space
(special case)
(special case)
Powering up
Powering up
and
and
commissioning
commissioning
Installation
Installation
2
2
check list
check list

Advertisement

Table of Contents
loading

Summary of Contents for Nokia Flexi BTS Series

  • Page 1     Lite Lite Quick Guide Quick Guide , cabling, and maintenance , cabling, and maintenance Lite Lite moun unte ted wall pole le. Contents of  Contents of      Preparing installation Preparing installation Clearances Clearances     Wall Wall installation installation delivery and...
  • Page 2 Networks. If you have not entered into an Agreement applicable to the Product, or if that Agreement has expired or has been terminated, You may not use this document in any manner and You are obliged to return it to Nokia Solutions and Networks and destroy or delete any copies may not use this document in any manner and You are obliged to return it to Nokia Solutions and Networks and destroy or delete any copies thereof.
  • Page 3 Installing and commissioning of BTS products must be performed by an expert Installing and commissioning of BTS products must be performed by an expert familiar with electronic devices, to avoid damage caused by improper handling. familiar with electronic devices, to avoid damage caused by improper handling.  ...
  • Page 4: Preparing Installation

        Clearances Clearances learances learances Walls / roofs / floors / other objects Walls / roofs / floors / other objects CAUTION! CAUTION! Mounting Mounting Risk of  Risk of  personal personal Middle Middle bracket bracket Cabinet Cabinet injury injury assembly assembly long...
  • Page 5     Wall installation (continued) Wall installation (continued)     Fixing module to the bracket Fixing module to the bracket 1. Connect the module with bracket. Align 1. Connect the module with bracket. Align     the holes on module's back to the fixing the holes on module's back to the fixing studs on mounting bracket.
  • Page 6 ESD wrist strap is connected. ESD wrist strap is connected.         Stacked installation on a wall (Optional) Stacked installation on a wall (Optional) a flat-head screwdriver  a flat-head screwdriver  Screw fo Screw four fixin fixing studs to t g studs to the top he top...
  • Page 7: Antenna Cabling

        Cabling Cabling Grounding Grounding 1. Connect the grounding cable to the grounding 1. Connect the grounding cable to the grounding point screw it in it in with (torx screw     (Opti (Optional onal) Se Secure cure cabl cable wi with a th a...
  • Page 8: Strain Relief Bar

        Cabling (continued) Cabling (continued) Strain relief bar  Strain relief bar  nstal tall strain relief bar a screw with t (T15) (T15) AC power cable AC power cable 1. Remove the IP boot from the module. 1. Remove the IP boot from the module.  ...
  • Page 9 Power supply wires are connected correctly. Power supply wires are connected correctly. Power supply cable is connected and secured correctly. Power supply cable is connected and secured correctly.     Cabling (continued) Cabling (continued) Securin Securing cables cables Secure the cables with Secure the cables with cable ties, if needed.
  • Page 10: Installing Optional Items

    Cables are threaded in a way that does not obstruct installation of the front cover. Cables are threaded in a way that does not obstruct installation of the front cover. Front cover and its maintenance strap are installed properly. Front cover and its maintenance strap are installed properly.  ...
  • Page 11: Top Cover

        In Insta stall llin ing optio ional item (conti ntinue Top cover  Top cover  1. Inst Install the ma all the mainten intenance ance trap as desc trap as described ribed “ “ In Inst stal alli ling ”...
  • Page 12: Installation Checklist

        -12- -12- Deploying in small space Deploying in small space     (special case) (special case) The special case can be applied when there is a very limited space and you cannot meet the regular  The special case can be applied when there is a very limited space and you cannot meet the regular  200 mm (7.87 in.) unit bottom clearance.

This manual is also suitable for:

Flexi bts 1900 fqfaFlexi bts 2100 fqga

Table of Contents