Page 1
Lite Lite Quick Guide Quick Guide , cabling, and maintenance , cabling, and maintenance Lite Lite moun unte ted wall pole le. Contents of Contents of Preparing installation Preparing installation Clearances Clearances Wall Wall installation installation delivery and...
Page 2
Networks. If you have not entered into an Agreement applicable to the Product, or if that Agreement has expired or has been terminated, You may not use this document in any manner and You are obliged to return it to Nokia Solutions and Networks and destroy or delete any copies may not use this document in any manner and You are obliged to return it to Nokia Solutions and Networks and destroy or delete any copies thereof.
Page 3
Installing and commissioning of BTS products must be performed by an expert Installing and commissioning of BTS products must be performed by an expert familiar with electronic devices, to avoid damage caused by improper handling. familiar with electronic devices, to avoid damage caused by improper handling. ...
Clearances Clearances learances learances Walls / roofs / floors / other objects Walls / roofs / floors / other objects CAUTION! CAUTION! Mounting Mounting Risk of Risk of personal personal Middle Middle bracket bracket Cabinet Cabinet injury injury assembly assembly long...
Page 5
Wall installation (continued) Wall installation (continued) Fixing module to the bracket Fixing module to the bracket 1. Connect the module with bracket. Align 1. Connect the module with bracket. Align the holes on module's back to the fixing the holes on module's back to the fixing studs on mounting bracket.
Page 6
ESD wrist strap is connected. ESD wrist strap is connected. Stacked installation on a wall (Optional) Stacked installation on a wall (Optional) a flat-head screwdriver a flat-head screwdriver Screw fo Screw four fixin fixing studs to t g studs to the top he top...
Cabling Cabling Grounding Grounding 1. Connect the grounding cable to the grounding 1. Connect the grounding cable to the grounding point screw it in it in with (torx screw (Opti (Optional onal) Se Secure cure cabl cable wi with a th a...
Cabling (continued) Cabling (continued) Strain relief bar Strain relief bar nstal tall strain relief bar a screw with t (T15) (T15) AC power cable AC power cable 1. Remove the IP boot from the module. 1. Remove the IP boot from the module. ...
Page 9
Power supply wires are connected correctly. Power supply wires are connected correctly. Power supply cable is connected and secured correctly. Power supply cable is connected and secured correctly. Cabling (continued) Cabling (continued) Securin Securing cables cables Secure the cables with Secure the cables with cable ties, if needed.
Cables are threaded in a way that does not obstruct installation of the front cover. Cables are threaded in a way that does not obstruct installation of the front cover. Front cover and its maintenance strap are installed properly. Front cover and its maintenance strap are installed properly. ...
In Insta stall llin ing optio ional item (conti ntinue Top cover Top cover 1. Inst Install the ma all the mainten intenance ance trap as desc trap as described ribed “ “ In Inst stal alli ling ”...
-12- -12- Deploying in small space Deploying in small space (special case) (special case) The special case can be applied when there is a very limited space and you cannot meet the regular The special case can be applied when there is a very limited space and you cannot meet the regular 200 mm (7.87 in.) unit bottom clearance.