Kees van der Westen Slim Jim Mirage Installation Manual

Hide thumbs Also See for Slim Jim Mirage:

Advertisement

Quick Links

Installation manual Slim Jim
espresso machines
(Original instructions)
Document ID: Sup-Tim-Eng
Date of issue: December 20, 2018
Revision date: June 24, 2020
[Typ hier]
[Typ hier]
[Typ hier]

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Slim Jim Mirage and is the answer not in the manual?

Questions and answers

Summary of Contents for Kees van der Westen Slim Jim Mirage

  • Page 1 Installation manual Slim Jim espresso machines (Original instructions) Document ID: Sup-Tim-Eng Date of issue: December 20, 2018 Revision date: June 24, 2020 [Typ hier] [Typ hier] [Typ hier]...
  • Page 2: Table Of Contents

    CONTENTS Designation ............................2 Safe operation ............................2 Installation manual ..........................3 Parts identification ..........................3 Installation summary ..........................4 Check location ..........................4 Unpack............................. 4 Install machine ..........................4 Transfer machine to owner/user ...................... 4 Water Quality ............................5 Water supply ............................
  • Page 3: Designation

    GENERAL Designation This manual applies to the 2-group and 3-group Slim Jim Mirage espresso machines with touchpad or Bastone operation manufactured by Kees van der Westen Espressonistic Works B.V. A separate rotational pump with electric motor is part of the appliance.
  • Page 4: Installation Manual

    Installation manual Parts identification Figure 1. Showing main operational parts of the Slim Jim Duette Bastone version with TECH legs. The Slim Jim Triplette has three groups but its functions are identical to the Duette. On the Touchpad version, the group brewing lever units are replaced with touchpads. 1.
  • Page 5: Installation Summary

    INSTALLATION MANUAL - summary Installation summary Check location 1. Check water quality. 2. Check water supply. 3. Have an adequate water treatment system installed. 4. (Flush water treatment system.) 5. Check water waste/drain. 6. Check countertop. 7. Check cupboard for pump location. 8.
  • Page 6: Water Quality

    INSTALLATION MANUAL – check location Water Quality Have the local water tested and ask the water supply company if there can be seasonal changes in water quality and when so, in what order these changes occur. Install a suitable treatment system that at least includes a carbon block in order to not only traps drug-remnants, Chlorine and organic compounds but also prevents rigid particles >30 μm to enter the pump.
  • Page 7: Water Supply

    INSTALLATION MANUAL – check location Water supply Rated pressure: 0.1-0.5 MPa (1-5 bar) Rated flow: minimum 4 litre/minute The water supply should be able to deliver a minimum amount of 4 litres per minute in the range 0.1- 0.5 MPa (1-5 bar). The machine and accompanying rotary vane pump must be connected with the supplied new set of high-pressure hoses (two hoses, each 1.5 meter long), old hose-sets should not be re-used.
  • Page 8: Electric Mains

    INSTALLATION MANUAL – check location Electric mains Rated voltage: ~230V / 3N~400V, 50 / 60Hz Rated power: max. 34.7 (230V) / 11.6 (400V) Amp per phase, see Table 2 for details.  Danger If the supply cord or the pump connection cord is damaged it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard.
  • Page 9: Single-Phase Machine

    INSTALLATION MANUAL – check location single-phase machine What we call a single-phase machine must be connected to P-N-E (single Phase + Neutral + Earth) or 2P-E (split Phase + Earth) power mains, see Figure 4. Note that the 2P-E configuration does NOT make use of the neutral wire of the electric mains.
  • Page 10: Unpack

    INSTALLATION MANUAL – unpack Unpack 1. Straighten the tabs that fixate the lid to the wooden crate, then remove the lid. 2. Unpack only the loose materials inside the crate. 3. remove the shelf from the crate. 4. Straighten the tabs on the two diagonally ribs of the crate. 5.
  • Page 11: Connect To Water Supply

    INSTALLATION MANUAL – install Connect to water supply Rated pressure: 0.1-0.5 MPa (1-5 bar) Rated flow: minimum 4 litre/minute The machine is equipped with a non-return valve that prevents water flowing back to the pump. The pump itself does not have a non-return valve. Note! When installing a new machine, always use new water supply hoses.
  • Page 12: Connect To Drain/Waste

    INSTALLATION MANUAL – install Connect to drain/waste • Normally, the drain hose of the machine will already be mounted onto the machine. The drain hose of the drip-tray is not yet mounted. Slide a hose clamp over the separate drain hose. Push the end of that drain hose onto the pipe of the drip-tray and tighten the hose clamp.
  • Page 13: Connect Electric Mains

    INSTALLATION MANUAL – install Connect electric mains Rated voltage: ~230V / 3N~400V, 50 / 60Hz Rated power: max. 32.2 (230V) / 11.3 (400V) Amp per phase, see Table 2 for details. The appliance is to be supplied through a residual current device (RCD) having a rated residual operating current not exceeding 30mA.
  • Page 14: First Fill

    The display will show a start-up window with software-version information and then turn to stand-by (“NO HEAT”). SUNDAY 08 : 00 NO HEAT KEES VAN DER WESTEN stand-by mode: NO HEAT the boilers will not window TECH. ASSISTANCE...
  • Page 15 INSTALLATION MANUAL – install 12. Mount a portafilter with blind-filter in one of the groups and activate that group. After the pre- infusion cylinder is filled the pressure should increase rapidly to about 9 bar on that groups’ pressure gauge, if not, adjust the pump-pressure (see Figure 10). Note that lowering the pump-pressure will not have an effect on the pressure gauge as there is a check-valve in the coffee system.
  • Page 16: Heat Up

    INSTALLATION MANUAL – install Heat up 1. Switch all three heat switches ON (lever up). This allows power to be fed onto the SSR’s in the machine. 2. Check if all the green indicator lights underneath the electrics box are lighting up (see Figure 11). a.
  • Page 17 INSTALLATION MANUAL – install STAND EXTERNAL 08 : 15 CLEAN SETTINGS touch menu window SETTINGS SENSOR PROGRAM ☼ FACTORY TECHNIC. MANAGER BARISTA EXIT touch settings window TECHNIC LEVEL LEVEL LEVEL LEVEL LEVEL ☼ TECHNICIAN PASSWORD: 00000 ENTER enter technic level the digit to change window is underlined...
  • Page 18 INSTALLATION MANUAL – install TEMP. VOLUME TIMED TIME EXIT touch barista sub-menu TIME window SETTING SETTING ON/OFF DATE DATE ☼ adjust duration of BACK SHOW SHOT TIME: (seconds) use ˄˅ or hh mm to shot time display change values after brew ☼...
  • Page 19 INSTALLATION MANUAL – install Figure 12. Print service record and fill out installation data. Keep this with the machine. Slim Jim Installation manual page 18...
  • Page 20: Adjust Mix-Water Temperature

    INSTALLATION MANUAL – install Adjust mix-water temperature The temperature of the mix-water depends on: 1. the steam boiler temperature, 2. the temperature of the cold water, 3. the amount of mixed-in cold water, which depends on: a. pump-pressure, b. cold-water orifice. 4.
  • Page 21 INSTALLATION MANUAL – install Figure 14. The location of the cold-water set-screw on the manifold. The locking nut prevents the set- screw from being dismounted and should not be loosened to adjust the set-screw. Turn the cold-water set-screw clockwise to increase the mix-water temperature and anti-clockwise to reduce the mix-water temperature.
  • Page 22: Hand Over Machine

    ECO MODE to go to window HEAT MODE stand-by ☼ ☼ MONDAY 08 : 45 NO HEAT KEES VAN DER WESTEN touch centre button stand-by without to return to heating TECH. ASSISTANCE SLIM JIM operational window touch left side to MONDAY...
  • Page 23 INSTALLATION MANUAL – hand over 4. Show how to enter the Barista menu (password: 33333) and: a. how to change temperature settings b. how to program shot-volumes: i. with the touchpad/Bastone (left group is dominant) ii. directly in the controller (left group is not dominant) c.
  • Page 24: Maintenance

    When seeking contact with the e-mail address above, please forward the model and serial number of the machine in question. Contact information Kees van der Westen Espressonistic Works B.V. Van Elderenlaan 6 5581WJ WAALRE The Netherlands Telephone +31 40 2223433 Email support@keesvanderwesten.com...

Table of Contents