Downward Cabling
Cabling on the left side is taken as an example in the description below, and that on the right side is the
same. Do not route the left E1 cables to the right side of the cabinet, or conversely.
In the case of downward cabling, lead the cables for the upper and lower subracks out from the
side walls of the cabinet. The cables for the upper subrack are routed on the side walls close to the
rear side of the cabinet, and the cables for the lower subrack are routed on the side walls close to
the front side of the cabinet.
a
Cable distribution plate
a
a