1. Move the PDC to the specified installation
position using a forklift.
2. Remove the two L-shaped brackets from
the front and rear of the PDC and pallet.
5. Adjust the PDC leveling feet using
a wrench to ensure that all castors
touch the ground.
6. Arrange four persons to push the
PDC off the wooden pallet to the
ground with caution.
Installing the PDC
4.2
Installing the PDC on a Concrete Floor
1. Determine the PDC
installation position.
2. Mark the positions for
installing expansion bolts.
3. Use a hammer drill to drill
holes to depths of 52 mm to
60 mm at the positions for
installing expansion bolts.
4. Slightly tighten the
expansion bolt and vertically
insert it into the hole. Knock
the expansion bolt using a
rubber mallet until the
expansion sleeve is fully
inserted into the hole.
5. Partially tighten the
expansion bolt.
6. Remove the bolt, flat
washer, and spring washer.
3. Use diagonal pliers to cut off the ties
securing the unloading ramp, and take out
the unloading ramp.
4. Clip the unloading ramp to the wooden
pallet.
To prevent cabinet tilting and avoid equipment
damage, adjust all the feet instead of one foot.
6
Unit: mm