Huawei PDU8000 Series Quick Manual page 5

Modular precision pdc (1100 mm deep)
Hide thumbs Also See for PDU8000 Series:
Table of Contents

Advertisement

3
Acceptance Guide
Unpacking and Accepting Goods
3.1
1. If any damage is found, report it to the carrier immediately.
2. After the equipment is delivered to the installation site, representatives from the customer and
Huawei unpack and inspect the equipment together.
3. Move the cabinet with caution to avoid bumping or toppling. To prevent damaging the
equipment, exercise caution when removing the packing materials.
1. Check whether the tiltwatch indicator on the carton has turned red. If yes, record the information
and contact the equipment carrier and the local Huawei office immediately.
2. Visually inspect the equipment appearance to check whether the equipment is paint-peeling,
misshapen, scratched, or soaked. If yes, record the information and contact the equipment
carrier and the local Huawei office immediately.
3. Check against the packing list that the equipment and fittings are correct and complete. If some
fittings are missing or do not comply with the models in the packing list, record the information
and contact the local Huawei office immediately.
Unpacking
3.2
1. Move the PDC to the specified installation position using a forklift.
2. Cut off and remove the binding straps.
3. Remove the packing materials and foam.
4. Remove the plastic bag, take out the fitting box, and put it away.
4
Installing the PDC
Transporting the PDC
4.1
1. The PDC weighs about 350 kg. Take protective measures during movement to prevent toppling
and bumping.
2. Avoid squeezing the MDU screen during the transportation.
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdu8000-0400acv4-sca126

Table of Contents