ABB free@home SUG-F-1.1 Product Manual
ABB free@home SUG-F-1.1 Product Manual

ABB free@home SUG-F-1.1 Product Manual

Split unit gateway

Advertisement

Quick Links

Product manual │ 18.02.2020
ABB-free@home
®
Split Unit Gateway
SUG-F-1.1

Advertisement

Table of Contents
loading

Summary of Contents for ABB free@home SUG-F-1.1

  • Page 1 Product manual │ 18.02.2020 ABB-free@home ® Split Unit Gateway SUG-F-1.1...
  • Page 2: Table Of Contents

    Links ..............................30     7.5.1   Split Unit GatewayLinking with scene ..................30   Creating a function on a ABB-free@homeTouch 4.3" ..............30     Failure and recovery of bus voltage ....................31     Updating options ............................32  ...
  • Page 3 Table of contents Operation ..............................33     Maintenance ..............................35     10.1 Maintenance-free device ........................35     10.2 Cleaning ............................35     Notes ................................36     Index ................................37     Product manual 9AKK107680A2816 │3...
  • Page 4: Notes On The Instruction Manual

    If you pass the device on, also pass on this manual along with it. ABB accepts no liability for any failure to observe the instructions in this manual. If you require additional information or have questions about the device, please contact ABB or visit our Internet site at: www.BUSCH-JAEGER.com...
  • Page 5: Safety

    However, residual hazards remain. Read and adhere to the safety instructions to prevent hazards of this kind. ABB accepts no liability for any failure to observe the safety instructions. Information and symbols used The following Instructions point to particular hazards involved in the use of the device or provide...
  • Page 6: Intended Use

    Each use not listed in Chapter 2.2 “Intended use“ on page 6 is deemed improper use and can lead to personal injury and damage to property. ABB is not liable for damages caused by use deemed contrary to the intended use of the device. The associated risk is borne exclusively by the user/operator.
  • Page 7: Target Group / Qualifications Of Personnel

    Safety Target group / Qualifications of personnel Installation, commissioning and maintenance of the device must only be carried out by trained and properly qualified electrical installers. The electrical installer must have read and understood the manual and follow the instructions provided.
  • Page 8: Safety Instructions

    Safety Safety instructions Danger - Electric voltage! Electric voltage! Risk of death and fire due to electric voltage of 100 … 240 V. Dangerous currents flow through the body when coming into direct or indirect contact with live components. This can result in electric shock, burns or even death.
  • Page 9: Information On Protection Of The Environment

    Information on protection of the environment Information on protection of the environment Environment Consider the protection of the environment! Used electric and electronic devices must not be disposed of with domestic waste. – The device contains valuable raw materials which can be recycled. Therefore, dispose of the device at the appropriate collecting depot.
  • Page 10: Setup And Function

    Split Unit. The same applies when a Split Unit is not ready to receive. Then, if necessary, a command may have to be sent via ABB- free@home ®...
  • Page 11: Device Overview

    Setup and function Device overview Fig. 1: Overview of devices [1] Bus connection terminal [2] Junction box IR cable [3] Identification LED [4] Identification button (Device identification during commissioning) Fig. 2: Overview of devices with air-conditioning unit   Product manual 9AKK107680A2816 │11...
  • Page 12: Overview Of Types

    Setup and function Overview of types Actuator Type Product name Device channels SUG-F-1.1 Split Unit Gateway Table 1: Overview of types Overview of functions The following table provides an overview of the possible functions and applications of the device: Icon in the user interface Information Name: Split Unit Gateway Function: Activation of a Split Unit Gateway ("air-conditioning...
  • Page 13: Functions

    Split Unit. The same applies when a Split Unit is not ready to receive. Then, if necessary, a command may have to be sent via ABB-free@home ® so that the status values are again being synchronized.
  • Page 14: Scope Of Supply

    Setup and function Scope of supply The scope of delivery contains the device including bus terminal for coupling to the ABB- free@home ® bus, as well as an IR cable.   Product manual 9AKK107680A2816 │14...
  • Page 15: Technical Data

    Technical data Technical data Technical data Designation Via ABB-free@home ® Supply voltage (21 - 31 V DC) Power supply Power loss P 0.4 W max. Power consumption Max. 12 mA ® ABB-free@home Bus connecting terminal, screwless. Connections Junction box IR cable...
  • Page 16: Dimensional Drawings

    Technical data Dimensional drawings Fig. 3: Dimensions of Split Unit Gateway (specifications in mm)   Product manual 9AKK107680A2816 │16...
  • Page 17: Connection, Installation / Mounting

    Connection, installation / mounting Connection, installation / mounting Requirements for the electrician Danger - Electric voltage! Install the device only if you have the necessary electrical engineering knowledge and experience. Incorrect installation endangers your life and that of the user of the electrical ■...
  • Page 18: Mounting / Dismantling

    Connection, installation / mounting Mounting / dismantling 6.2.1 Mounting The device is suitable for installation in flush-mounted or surface-mounted boxes. ■ The device can be mounted in any position. ■ Maintain a maximum distance of 2 m to the Split Unit. ■...
  • Page 19: Electrical Connection

    Connection, installation / mounting Electrical connection The connection to the bus line is made via the enclosed bus connection terminal (red/black). ■ The device is ready for operation after the bus voltage has been applied. ■ Mounting and commissioning must only be carried out by qualified electrical installers. When planning and setting up electrical systems and security-related systems for the detection of intrusion and of fires, the relevant standards, guidelines, rules and regulations of the respective country are to be observed.
  • Page 20: Commissioning

    Initial commissioning Commissioning is always carried out via the Web-based surface of the System Access Point. The System Access Point establishes the connection between the ABB-free@home ® participants and the smartphone, tablet or PC. It is used to identify and program the participants during commissioning.
  • Page 21: Allocation Of Devices And Definition Of Channels

    Commissioning Allocation of devices and definition of channels The devices connected to the system must be identified, i.e. they are allocated to a room according to their function and are given a practical name. The allocation is made via the "Devices" allocation function of the Web-based user interface of the System Access Point.
  • Page 22 Commissioning Fig. 5: Add device 2. In the "Add device" bar select the desired application and pull the icon via drag-and-drop onto the floor plan in the working area. Fig. 6: Allocation of devices – If several devices suitable for the selected application are integrated, a dialogue field with the listed devices is displayed.
  • Page 23 Commissioning Identification via serial number Fig. 7: Identification via serial number 3. Compare the serial number and the short ID of the identification label printed on the device with the numbers and IDs in the list. This is how the searched for device and possibly the searched for channel are identified.
  • Page 24 Commissioning Identification via switching Fig. 8: Identification via switching 1. Select a device and a channel from the list. 2. Press the button in the detailed view of the device.   Product manual 9AKK107680A2816 │24...
  • Page 25 Commissioning 3. The control element of the Split Unit Gateway opens. Fig. 9: Control element Split Unit Gateway 4. Perform a function. The connected load is switched correspondingly via the control element. Continue until you have found the device you are looking for.  ...
  • Page 26 Commissioning Identification via the identification button Notice You can carry out the identification via the identification button only if you have authorization for direct access to the Split Unit Gateway. 1. Press the identification button on the Split Unit Gateway. –...
  • Page 27: Setting Options Per Channel

    Commissioning Setting options per channel General settings and special parameter settings must be made for each channel. The settings are made via the allocation function of the Web-based user interface of the System Access Point. Select device Remote Control Remote Control Fig.
  • Page 28: Settings Of The Split Unit Gateway

    Commissioning 7.4.1 Settings of the Split Unit Gateway Fig. 12: Parameter settings [1] Changing the name [2] Deleting the channel [3] Switching the actuator on/off via the button [4] Call-up or closing the control element of the actuator via the arrow button (For description, see Chapter 9 "Operation") [5] Call-up of the selection for allocating the corresponding remote control via button (Description See “Selecting remote control“...
  • Page 29 Commissioning Unit Gateway, the highest permitted value is sent to the Split Unit. The status value is adjusted accordingly. [8] Setting the minimum setpoint temperature via the -/+ buttons. This parameter fixes the limits for the setpoint temperature. If a temperature value below the minimum setpoint temperature is sent to the Split Unit Gateway, the lowest permitted value is sent to the Split Unit.
  • Page 30: Links

    In the panel configuration the buttons of the device can be freely equipped. The function of the Split Unit Gateway can be positioned in the panel view the same as other functions. The general process is described in the product manual of the ABB- free@homeTouch 4.3".
  • Page 31: Failure And Recovery Of Bus Voltage

    Commissioning Failure and recovery of bus voltage At a bus voltage failure you receive an error message. The status of the device (and the Split Unit) remains unchanged. The Split Unit Gateway does not respond during a bus voltage failure. After the recovery of the bus voltage the status of the Split Unit normally remains unchanged.
  • Page 32: Updating Options

    Updating options Updating options The firmware update is carried out via the Web-based user interface of the System Access Point, see www.abb.com/freeathome.   Product manual 9AKK107680A2816 │32...
  • Page 33: Operation

    Operation Operation Operation is carried out via the control element of the Split Unit Gateway in the Web-based user interface of the System Access Point or in the free@home app. Fig. 15: Control element in the Web-based user interface of the System Access Point [1] Switching the actuator on/off via the button [2] Call-up or closing the control element of the actuator via the arrow button (only visible in the panel configuration)
  • Page 34 Operation Operation can also be carried out via a ABB-free@homeTouch 4.3". Here the control element has the following appearance. The functions are as described above. Fig. 16: Control element on a ABB-free@homeTouch 4.3" Notice The actuator is switched on/off via the on/off characters.
  • Page 35: Maintenance

    Maintenance Maintenance 10.1 Maintenance-free device The device is maintenance-free. In case of damage, e.g. during transport or storage), do not perform repairs. Once the device is opened, the warranty is void. Access to the device must be guaranteed for operation, testing, inspection, maintenance and repairs (according to DIN VDE 0100-520).
  • Page 36: Notes

    Notes Notes   Product manual 9AKK107680A2816 │36...
  • Page 37: Index

    Index Index Links ............30 A  Add device ..........21 M  Allocation of devices ........21 Maintenance ..........35 Assigning a name .......... 26 Maintenance-free device ........35 Mounting ............. 18 B  Bus voltage recovery ........31 N  Notes ............36 C ...
  • Page 38 Busch-Jaeger Elektro GmbH A member of the ABB Group PO box 58505 Lüdenscheid Freisenbergstraße 2 58513 Lüdenscheid www.BUSCH-JAEGER.com info.bje@de.abb.com Central sales service: Tel.: +49 2351 956-1600 Fax: +49 2351 956-1700 Copyright © 2020 Busch-Jaeger Elektro GmbH All rights reserved...