Table 9-11 Setting NetEco configuration parameters
Path
System Info >
Settings >
Communication
Step 7 (Optional) Set the parameters of the transformer surge protection and high temperature
alarms.
Path
System Info > Settings >
Basic Param.
System Info > Settings >
Basic Param.
----End

9.3 Connecting the Load Power Supply

Procedure
Step 1 Turn the isolation switch in the isolation transformer to ON.
Issue 03 (2020-04-10)
Parameters
NetEco Primary IP
NetEco Port
Number
The parameters need to be set on the MDU of the slave cabinet only in the parallel system scenario.
Copyright © Huawei Technologies Co., Ltd.
Default Value
192.168.000.010
31220
Parameters
Transformer Cab SPD Fault
Condition
DIN5 Reuse
9 Power-on and Commissioning
Setting
Set this parameter
based on the address
assigned by the
network
administrator.
Set based on site
requirements.
NOTE
Configurable range:
1–65525
Setting
Close
NOTE
The transformer surge
protection alarm is shielded.
None
NOTE
The transformer high
temperature alarm is shielded.