PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
Figure 6-7 Installing a BIM (battery 1)
Figure 6-8 Installing a BIM (battery 2)
Step 6 (Optional) Reinstall the insulation cover for the battery.
Step 7 Install other BIMs in the same way.
----End
Issue 03 (2020-04-10)
Copyright © Huawei Technologies Co., Ltd.
6 Installing a BIM
47