Installation Verification - Huawei PowerCube 5000 Installation Manual

Hide thumbs Also See for PowerCube 5000:
Table of Contents

Advertisement

PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
After installing the cabinet and all equipment, check the installation items, installation
environment, and cables.
Checking the Cabinet Installation
Table 8-1 Cabinet installation checklist
No.
1
2
3
4
5
Checking the Environment
Table 8-2 Environment checklist
No.
1
2
Issue 03 (2020-04-10)
8
Check That
The cabinet is placed in accordance with the design
drawing.
The base is secured.
All bolts, especially the bolts used for electrical
connections, are fully tightened. Flat washers and spring
washers are all installed in correct sequence.
The cabinet is clean, free of dust and dirt.
All labels are correct, clear, and complete.
Check That
There are no unnecessary adhesive tape or cable ties on
cables.
There are no adhesive tapes, cable ties, paper scraps, or
packing materials around the cabinet.
Copyright © Huawei Technologies Co., Ltd.

Installation Verification

8 Installation Verification
Result
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
Result
□ Yes □ No
□ Yes □ No
67

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-150ktl-s0

Table of Contents