1
Strip the motor and mains cables as advised below.
A1
B1
Frame
A1
FS8
40 (1.57) 180 (7.08)
FS9
40 (1.57) 180 (7.08)
Earth conductor
C1
D1
MAINS
Figure 28.Stripping of cables.
Table 22. Cables stripping lengths in mm (in.).
B1
C1
25 (.98)
25 (.98)
Earth conductor
E
MOTOR
D1
C2
300 (11.8)
25 (.98)
300 (11.8)
25 (.98)
24-hour support +1-800-877-7545 (Dial 2)
Power cabling
C2
D2
D2
E
300 (11.8) Leave as
short as
300 (11.8)
possible