9.4.6.3 Lightning Protection; Cable; 9.4.7.1 Cable Assembly By The Customer - Siemens SIMATIC MOBY D System Manual

Rfid systems
Table of Contents

Advertisement

System integration
9.4 ASM 475

9.4.6.3 Lightning protection

Implement lightning protection provided that it is appropriate for your application. An
individual appraisal of the entire plant is necessary before initiating any lightning protection
measures.
9.4.7

Cable

9.4.7.1 Cable assembly by the customer

To achieve electromagnetic compatibility, the SLG cable must be routed via an S7-300
shield connecting element. When the customer assembles the SLG cable, the cable shield
must be exposed (see the figure below).
Figure 9-22
260
Exposure of the cable shield for cable assembly by the customer
System Manual, 01/2010, J31069-D0147-A6-7618
MOBY D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents