GE LOGIQ E9 User Manual page 141

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

Trophon EPR Instructions for Use (continued)
Removing the
Probe after
7-minute cycle
time
LOGIQ E9
User Guide
Direction 5454884-100 English Rev. 1
12. Press the probe's electrical cable into the cable clamp,
found at the top of the chamber.
13. Close the chamber door. It will automatically lock.
14. The screen message "Is the probe clean and dry?" appears,
select Yes.
15. Press "Start" to begin the disinfecting process.
16. Discard disposable gloves.
1. Wear a new pair of disposable gloves.
2. When "Cycle complete" displays on the screen, open the
chamber door.
3. Check the Chemical Indicator color change and refer to the
Chemical Indicator.
4. Remove the Chemical Indicator from device and discard.
5. Remove the probe from the Trophon EPR.
6. Wipe the probe prior to use with an absorbent, single-use,
dry, lint-free cloth.
7. Remove and discard the disposable gloves.
Probe Overview
3-15

Advertisement

Table of Contents
loading

Table of Contents