Download Print this page
Total Gym SPORT Assembly And Setup Instructions
Hide thumbs Also See for SPORT:

Advertisement

Quick Links

Totalgym.com
Part # 55100-01
©2010 EFI Corporation dba Total Gym. All rights reserved. Total Gym is a registered trademark of EFI Corp. Unauthorized duplication of this booklet is punishable by law.
U.S. Customer Service: 858.586.6080
SPORT: Designed in the United States of America. Manufactured in Taiwan. Covered by one or more of U.S. Pat. Nos. 5,967,955; 7,766,801; and other patents pending.
21
When both left and right pull-pins are engaged into the rails, rotate the folding
platform away from the glideboard until the lower pull-pin on the left side pops
into the rail hole. To fold the platform for storage, simply disengage the lower
left pull-pin and fold the platform (the squat stand will be attached).
Lower
pull pin
TeleScoPing SqUaT STanD aTTachmenT
22
Lift the release lever on the
back of the telescoping squat
stand. Align the squat stand
receptacle posts over the
folding platform posts. Slide
the squat stand down and align
it with one of the three levels
indicated by the holes in the
posts. Release the lever to lock
the squat stand into place.
23
Inspect the lever and pull up on the squat stand handle to insure the squat
stand is locked in on both sides.
inSTalling The hanDleS
24
Open the hardware box and remove the
handles and threaded quick links
as shown. Install them on each end of
the cable.
almoST finiSheD
25
When the assembly is finished, look for extra parts to ensure no steps were
missed. Inspect your Total Gym
®
for defects and contact Customer Service if
you feel you have any problems. Before using your new Total Gym, read the
safety and usage instructions in the Owners Guide.
yoUR ToTal gym SPoRT
iS now ReaDy To USe.
TM
ToTal gym SPoRT
Tm
aSSemBly anD SeT-UP inSTRUcTionS
Removing ToTal gym SPoRT fRom The Box
1
Remove the lid of the Total Gym
box and set it aside.
®
2
Remove all interior boxes from the top and sides. Cut the tape on the end of
the box at the base of the tower. Unfold that end of the box.
3
Stand the Total Gym Sport
TM
upright and roll it to the location where you want
the tower to stand.
ToTal gym SPoRT Box conTenTS:
• Total Gym Sport Complete Assembly
• Folding Foot Holder
• Folding Platform
• Hardware & Information Box
• Telescoping Squat Stand
4
Remove the folding platform and the telescoping squat stand parts from the
bottom of the box.
UnfolDing ToTal gym
5
Unlatch the rails from the tower.
6
Standing at the side of the unit, with one hand
behind the tower and the other hand on the
glideboard, tilt the unit slightly backward and
use your foot to push the rail base away from
Hold
the tower. The tower will follow the upper rails
tower
forward and then it will begin to pull away from
the rails, backward to an upright position.
Caution! The tower is designed to open
automatically by pulling away from the upper
rails as the rails begin to unfold. Do not force
Push rail
or push the tower away from the rails, as this
base here
with foot
may cause the tower to fall backward.
Latch
Hold
glideboard

Advertisement

loading
Need help?

Need help?

Do you have a question about the SPORT and is the answer not in the manual?

Questions and answers

Summary of Contents for Total Gym SPORT

  • Page 1 • Hardware & Information Box aSSemBly anD SeT-UP inSTRUcTionS ©2010 EFI Corporation dba Total Gym. All rights reserved. Total Gym is a registered trademark of EFI Corp. Unauthorized duplication of this booklet is punishable by law. • Telescoping Squat Stand U.S.
  • Page 2 ToTal gym SPoRT haRDwaRe & infoRmaTion Box conTenTS: • Quick Links (2) • Assembly Instructions and Owner’s Guide Totalgym.com • Strap Handles (2) • Assembly, Set-up and Storage DVD U.S. Customer Service: 858.586.6080 Note: When the folding foot holder is attached after assembly, grasp the rails...