Huawei RRU3268 Installation Manual page 55

Hide thumbs Also See for RRU3268:
Table of Contents

Advertisement

RRU3268
Installation Guide
3.
Issue ()
Figure 7-10 Binding cable ties
Installation engineer B wraps the power cable connector with a layer of PVC insulation
tape, as shown in
Figure
NOTE
Wrap the PVC insulation tape from 30 mm (1.18 in.) away from one end of the connector until it
reaches the other end of the connector. The total length of the wrapped connector is 100 mm (3.94
in.).
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
7-11.
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents