RRU3268
Installation Guide
Figure 7-1 Hoisting the RRU onto the tower
(1) Lifting sling
1.
2.
Issue ()
After climbing up to the tower, installation engineer A secures the fixed pulley to the tower
platform support and leads the lifting sling through the fixed pulley.
Installation engineer C binds the RRU mounting kits properly using a lifting sling, as shown
in
Figure
7-2, and binds the RRU using a lifting sling and a traction sling, as shown in
Figure
7-3.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
(2) Fixed pulley
(3) Traction sling
39