Huawei RRU3268 Installation Manual page 54

Hide thumbs Also See for RRU3268:
Table of Contents

Advertisement

RRU3268
Installation Guide
Figure 7-9 Hoisting power cables onto the tower
(1) Lifting sling
1.
2.
Issue ()
After climbing up to the tower, installation engineer A secures the fixed pulley to the tower
platform support and leads the lifting sling through the fixed pulley.
Installation engineer B secures three cable ties to the power cable connector, and then
secures the power cable to the lifting sling, as shown in
NOTE
The connector on the power cable in the figure is only an example. The actual connector may vary
according to the situation.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
(2) Fixed pulley
Figure
7-10.
46