ABB 2600T Series Operating Instruction page 47

Pressure transmitters
Hide thumbs Also See for 2600T Series:
Table of Contents

Advertisement

Products
Automation Systems
for the following industries:
– Chemical & Pharmaceutical
– Food & Beverage
– Manufacturing
– Metals and Minerals
– Oil, Gas & Petrochemical
– Pulp and Paper
Drives and Motors
AC and DC Drives, AC and DC Machines, AC Motors to 1kV
Drive Systems
Force Measurement
Servo Drives
Controllers & Recorders
Single and Multi-loop Controllers
Circular Chart , Strip Chart and Paperless Recorders
Paperless Recorders
Process Indicators
Flexible Automation
Industrial Robots and Robot Systems
Flow Measurement
Electromagnetic Magnetic Flowmeters
Mass Flow Meters
Turbine Flowmeters
Wedge Flow Elements
Marine Systems & Turbochargers
Electrical Systems
Marine Equipment
Offshore Retrofit and Refurbishment
Process Analytics
Process Gas Analysis
Systems Integration
Transmitters
Pressure
Temperature
Level
Interface Modules
Valves, Actuators and Positioners
Control Valves
Actuators
Positioners
Water, Gas & Industrial Analytics Instrumentation
pH, conductivity, and dissolved oxygen transmitters and
sensors
ammonia, nitrate, phosphate, silica, sodium, chloride,
fluoride, dissolved oxygen and hydrazine analyzers.
Zirconia oxygen analyzers, katharometers, hydrogen purity
and purge-gas monitors, thermal conductivity.
PRODUCTS & CUSTOMER SUPPORT
Customer Support
We provide a comprehensive after sales service via a
Worldwide Service Organization. Contact one of the following
offices for details on your nearest Service and Repair Centre.
Italy
ABB S.p.A. - ABB SACE Division
Business Unit Instrumentation
Tel: +39 0344 58111
Fax: +39 0344 56278
United Kingdom
ABB Limited
Tel: +44 (0)1453 826661
Fax: +44 (0)1453 827856
United States of America
ABB Inc.
Tel: +1 (0) 755 883 4366
Fax: +1 (0) 755 883 4373
Client Warranty
Prior to installation, the equipment referred to in this manual must
be stored in a clean, dry environment, in accordance with the
Company's published specification.
Periodic checks must be made on the equipment's condition. In
the event of a failure under warranty, the following
documentation must be provided as substantiation:
1. A listing evidencing process operation and alarm logs at time
of failure.
2. Copies of all storage, installation, operating and maintenance
records relating to the alleged faulty unit.
- 47 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

268h268n

Table of Contents