Note: Determine the left and right sides of the machine
from the normal operating position.
Note: Whenever the verticutter has to be tipped to expose
the verticutter blades, use the kick stand (supplied with
traction unit)
(Figure
3).
1. Kick stand
1
Inspecting the Verticutter
Parts needed for this procedure:
1
Verticutter
Procedure
After the verticutter is removed from the box, inspect the
following:
1. Check each end of the reel for grease. Grease should be
visibly evident in the internal splines of the reel shaft.
2. Ensure that all nuts and bolts are securely tightened.
Figure 3
2
Installing the Transport Rollers
Parts needed for this procedure:
2
Transport roller assembly
2
Cotter pin
Procedure
Secure a transport roller bracket to each side plate pin with
a cotter pin
(Figure
g196702
1. Transport roller assembly
Note: The roller should be positioned to the rear of the
verticutter.
5
4).
Figure 4
2. Cotter pin
g195548