5.2 Installation
Building Technologies
Fire Safety
Observe the country-specific regulations for the exact installation height!
The manual call point is prepared for installation. See the chapter 'Preparation
23]'.
1. Secure the housing at a height of 0.9...1.6 m on an even surface. See the
chapter 'Master gauge for recesses [
-
Only use the screw holes marked with arrows (see diagram below).
2. Pull the cables through the entry opening(s) into the housing.
3. Tighten the cable gland so that it is properly sealed.
The manual call point is now prepared for electrical connection.
Screw holes for manual call point FDM243H
Commissioning
Installation
39]'.
A6V10374021_c_en_--
6
25
2014-07-01