NEC Express5800 series User Manual page 56

Hide thumbs Also See for Express5800 series:
Table of Contents

Advertisement

Installing the Rail Assemblies
1.
Push up the catch at the top end of each rail assembly. Butt the top frame to the rack
frame through the inside of the rack, and secure the rail assembly with two screws and
two washers.
NOTE:
Position the rail assembly so the screw slot at the top becomes
vertical.
Slide each rail bracket to butt it to the rack frame through the inside of the rack, and
2.
secure the rail bracket with two screws and two washers.
Position the rail bracket so the screw slot at the top becomes
NOTE:
vertical.
46 Setting Up Your Storage Server
Catch
Screw hole for securing the
server to the rack
Three screw slots should be
visible in the range of "1U."

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storage ns420

Table of Contents