Inspections; Check The Power Connection; Procedure Preparing For Production - Samsung SM421 Operation Handbook

Advanced flexible component placer
Table of Contents

Advertisement

PART II. Power supply and Procedure Preparing for Production

Procedure Preparing for Production

1. Inspections

1. Check the power connection

- Be sure to check around and inside the machine before turning on the main switch.
- Check if there is any foreign matter such as a chip on the feeder base, and whether the feeder is correctly installed.
- Check if the nozzle is blocked with any foreign matter such as solder and the operation of the nozzle spring is smooth.
Caution
- Check whether the safety doors at the front and rear are open. If opened, close them.
[CH1]
TRAY
FEED
[CH2]
ER
NEXT
INTE
RFAC
LAN
E
PREV
IOUS
MCC
B
GRO
UND
SM421 Operation Handbook
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents