PART II. Power supply and Procedure Preparing for Production
Procedure Preparing for Production
1. Inspections
1. Check the power connection
- Be sure to check around and inside the machine before turning on the main switch.
- Check if there is any foreign matter such as a chip on the feeder base, and whether the feeder is correctly installed.
- Check if the nozzle is blocked with any foreign matter such as solder and the operation of the nozzle spring is smooth.
Caution
- Check whether the safety doors at the front and rear are open. If opened, close them.
[CH1]
TRAY
FEED
[CH2]
ER
NEXT
INTE
RFAC
LAN
E
PREV
IOUS
MCC
B
GRO
UND
SM421 Operation Handbook
14