ABB rec670 Commissioning Manual page 123

Intelligent electronic device
Hide thumbs Also See for rec670:
Table of Contents

Advertisement

1MRK 511 360-UEN A
Bay control REC670 2.1 IEC
Commissioning manual
Testing functionality by secondary injection
If tDef_OC is set to a value different from 0 s, then this time
delay is added to the one that is defined by the IDMT
characteristic.
10. Check the start and operate information that are stored in the event menu.
11. The previous step 8 or 9 may be repeated also for the first and second section of
the characteristic.
12. Supply the IED with symmetric three-phase voltages at their rated values. Go to
Main menu/Settings/IED Settings/Current protection/
VoltageRestOverCurr(51V,2(I>/U<))/VRPVOC(51V,2(I>/U<)):1/
Undervoltage and set the setting Operation_UV = On to activate the
undervoltage stage.
13. Slowly decrease the voltage in two phases simultaneously, until the STUV and
START signals appear.
14. Note the operate value. The set operate value in secondary volts is calculated
according to the following equation:
StartVolt UBase
×
×
100
VTprim
3
IECEQUATION2436 V1 EN
If the VRPVOC function is used as an overcurrent protection
with undervoltage seal-in, it is necessary to first inject sufficient
current to activate the STOC signal before the under-voltage
step is allowed to operate. In order to achieve that, apply
symmetric three-phase voltages at their rated value and then
inject a current IL1 that is 200% higher than the set operation
level. Then slowly decrease the voltage in two phases
simultaneously, until the STUV and START signals appear.
15. Increase slowly the applied voltages of the previous two phases and note the
reset value.
16. Check that the trip output of the relay is connected to the input channel of the test
in order to stop the injection and measure the trip time.
17. Inject symmetric three-phase voltages at their rated value and check that the
STUV and START signals reset as well as the trip signals of the function block
(TRIP and TRUV).
18. Instantaneously decrease the voltage in two phases simultaneously to a value
20% lower than the set operate value (take into account the previous note if
VRPVOC is configured in ACT with the undervoltage seal-in feature).
19. Measure the definite time delay for the TRUV and TRIP signals and compare it
with the set value tDef_UV.
20. Check that start and operate information is stored in the event menu.
VT
sec
Section 10
(Equation 19)
117