Installing A Storage Sled - Dell PowerEdge FX2 Owner's Manual

Hide thumbs Also See for PowerEdge FX2:
Table of Contents

Advertisement

Related Tasks

Installing a storage sled

Installing a storage sled
Prerequisites
CAUTION: Many repairs may only be done by a certified service technician. You should only
perform troubleshooting and simple repairs as authorized in your product documentation, or as
directed by the online or telephone service and support team. Damage due to servicing that is
not authorized by Dell is not covered by your warranty. Read and follow the safety instructions
that came with the product.
CAUTION: To prevent damage to the I/O connectors, do not touch the connectors or the
connector pins.
CAUTION: To prevent damage to the sled locks, use a #2 Phillips screwdriver to turn the sled
locks to lock or unlock positions.
NOTE: Install the storage sleds in the bottom slots of the PowerEdge FX2s enclosure, beginning
from the left (slot 3). In the four-bay chassis, you can also install a storage sled in the top right slot
(slot 2) of the enclosure. For more information on sled slot numbering, see the Dell PowerEdge FX2
and FX2s Enclosure Owner's Manual at Dell.com/poweredgemanuals.
NOTE: If your storage sled has shipped pre-installed in the enclosure, it is recommended that you
remove the sled before installing the enclosure in the rack, to reduce chassis weight.
NOTE: If you are installing the storage sled in an enclosure that is already powered on, you need not
turn off the enclosure to install the storage sled. Only the compute sled(s) to which the storage sled
is mapped must be turned off.
1.
Ensure that you read the Safety instructions.
2.
Turn off the compute sled to which the storage sled is mapped, by using the CMC, iDRAC, or the
power button on the compute sled.
3.
Keep the #2 Phillips screwdriver ready.
Steps
1.
If you are installing a new storage sled, remove the I/O connector cover and save for future use.
2.
Align the storage sled with the bay in the enclosure.
CAUTION: To ensure that a storage sled is properly installed, slide the sled into the enclosure
bay until the dotted line on top of the storage sled is not visible from the top edge of the bay
in which the storage sled is being installed.
CAUTION: If a compute sled is already installed in an enclosure bay above the bay in which
you are installing a storage sled, the compute sled may obscure the dotted line on the
storage sled. Do not use the compute sled installed in the top enclosure bay as a point of
reference for visibility of the dotted line on top of the storage sled. For the storage sled to be
properly installed, ensure that the dotted line on the storage sled is not visible from the top
edge of the bay in which the storage sled is installed.
3.
Slide the storage sled into the enclosure until the dotted line on top of the sled is not visible from the
top edge of the bay, and the sled clicks into place.
4.
Turn the storage sled locks to the lock position, to secure the sled in the enclosure.
CAUTION: Ensure that the sled locks are in locked position before opening the storage sled
drive drawer, as the storage sled must be locked in the enclosure before you open the drive
drawer.
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poweredge fx2sE24s

Table of Contents